Wellhead Operations & Maintenance Installation, Inspection & Best Practices
Duration: 5 Days
Target Audience: Wellhead Engineers, Field Operators, Maintenance Technicians, Completion Engineers, Production Supervisors
Delivery Mode: Classroom / Virtual with Practical Demonstrations, Case Studies, and Maintenance Exercises
Level: Intermediate

Course Overview

This course delivers comprehensive training on wellhead systems, covering installation, operation, inspection, troubleshooting, and maintenance. Participants will develop a strong understanding of wellhead components, safety requirements, pressure control, and integrity management, equipping them to extend the safe operating life of wells.

Day-by-Day Outline

Day 1 – Fundamentals of Wellhead Systems

  • - Types of wellheads: conventional, subsea, and specialized systems
  • - Components: casing heads, casing spools, tubing heads, trees
  • - Pressure ratings, API standards, and wellhead specifications
  • - Wellhead installation sequence overview
  • - Exercise: Identify wellhead components on technical diagrams

Day 2 – Wellhead Installation & Commissioning

  • - Preparing the well site for wellhead installation
  • - Step-by-step installation of casing and tubing heads
  • - Setting and testing casing hangers
  • - Installing Christmas trees and control systems
  • - Workshop: Plan a wellhead installation sequence for a vertical well

Day 3 – Operation & Routine Maintenance

  • - Operating procedures for wellhead valves and control systems
  • - Lubrication, greasing, and sealing practices
  • - Pressure testing and integrity verification
  • - Managing corrosion and erosion in wellhead equipment
  • - Exercise: Prepare a routine maintenance checklist for a wellhead

Day 4 – Wellhead Inspection & Troubleshooting

  • - Visual and non-destructive inspection techniques
  • - Detecting leaks, pressure drops, and seal failures
  • - Diagnosing casing/tubing hanger issues
  • - Repairing or replacing damaged wellhead components
  • - Workshop: Analyze wellhead failures from field case studies

Day 5 – Safety, Best Practices & Field Applications

  • - Safety standards and regulatory requirements for wellhead operations
  • - H2S and high-pressure considerations
  • - Lockout/tagout (LOTO) procedures
  • - Wellhead integrity management programs
  • - Capstone Project: Develop a complete wellhead maintenance and inspection plan for a producing field

Expected Learning Outcomes

  •  Identify and explain key wellhead components and their functions
  •  Plan and execute wellhead installation and commissioning
  •  Perform routine wellhead maintenance and integrity checks
  •  Diagnose and resolve common wellhead issues
  •  Apply industry best practices for safe and reliable wellhead operations
Customizable Add-ons
Tailored content for local geology (e.g. Nile Delta, Western Desert)
Lab visit or simulation hands-on demo
Integration with economics or production courses

Special Customization for Regional NOCs

- Includes legal and fiscal case examples from MENA & Africa
- Arabic-English bilingual delivery available
- Tailored licensing round simulation exercises
- Optional site visits to local oilfields or regulatory agencies






Trainer Profile

- Senior reservoir and exploration engineers from IOCs and NOCs
- Former advisors to government ministries
- Experts in petroleum contracts and economic modeling


Certification

Participants will receive a Certificate of Completion and a performance report including assessment outcomes and instructor feedback.